Sherwood Cass R-VIII Addition and Renovations

X

Creighton, Missouri

Type: Addition and Renovations

Building Square Footage:

          VoAg Addition: 7,602 sf

          Renovations: 13,592 sf

Construction Cost: $2,700,000

 

Services Rendered: Architectural Design

 

iDS was hired by the Sherwood Cass School District to assist them in renovating their entire K-12 campus. 

​

The main components of the 2016 Bond Issue includes secure entries, new/renovated administration offices, and face-lifts to both the High School and Elementary School to create a cohesive feel throughout the campus. A new weight room, art room and 5,000 square foot VoAg Shop with two adjacent teaching spaces were added to the High School.

​

Other additions and renovations include adding a second entrance on site in way of an entry road to the Elementary School, ADA compliant sidewalks leading to both the baseball and softball fields, re-roof work on portions of the Elementary school, and cafeteria improvements which includes a new ADA compliant restroom.

​

Construction was completed by the Fall Semester of 2017.

​

​

 

 

© 2019 incite Design Studio

incite Design Studio architects
overland park
st. louis
kansas city
  • facebook logo
  • Twitter_logo-teal sized.png
  • Linkedin Teal Logo.png
  • HOME

  • RELATIONSHIPS

  • OUR WORK

  • ABOUT US

  • CAREERS

  • CONTACT US

  • More